A standard refurbishment turned into a far larger schedule of works. Upon opening up the flooring and the external wall render, a huge amount of both wet and dry rot were exposed.

A standard refurbishment turned into a far larger schedule of works. Upon opening up the flooring and the external wall render, a huge amount of both wet and dry rot were exposed.

The front elevation of the property had dropped off level approx 50 mm causing all the decorative brick work to fall out of sync ad the internal rooms to the front to run of level in their floor rooms.

The front elevation was underpinned to engineers details and fully reinstated with new glazing, flooring, and damp proof treatment carried out to help prevent any further issues.

Before
If you like the work we do, please don't hesitate in reaching us.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form
Write us a Line,
we will anwser as soon as possible.

Lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua. 

01 234 567 890
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form